Sawtell Sewage Pump Station

Client

Project Value

$4m

Location:

Sawtell NSW

Industry:

Wastewater

Project Requirements:

  • Construction of a reinforced concrete wet well 10m diameter & 10m deep via secant pile method. The wet well will be made up of approximately 20 tonnes of steel and 250 cubic metres of high strength concrete
  • Construction of a double skin (brick & block) Switchroom c/w generator room and Amenities
  • Construction of reinforced concrete Valve & Flowmeter Pits
  •  Construction of reinforced concrete Biofilter slab & installation of Biofilter system
  •  Construction of Dosing Unit foundations & reinforced concrete bunded area
  •  Construction of reinforced concrete hardstand area surrounding all structures
  •  Construction of a new access road and ring road to allow access to the new facility
  •  Installation of new site fencing and final landscaping to tie in with existing surrounds.