Demolition and the construction of new twin water supply mains to Grafton, Yamba and Iluka. The new river crossing involved the demolition of the existing timber bridge and degraded water main and the installation of new 525mm and 600mm sintakote pipelines. Existing timber piles were utilised and new pile caps , columns, head stocks and debris beam built through the watercourse.