Yamba Sewerage Augmentation

work 10-11-15 470
Yamba Sewerage Augmentation – Reticulation and Transfer Systems
Client: Clarence Valley Council Description of role: Pump station upgrade, construction of 4 new rising mains, design, supply and installation of mechanical and electrical fit-out to 3 pumps stations, recycled water main, D&C of ebb tide release including delivery pipeline and diffuser system, design, supply and installation of stormwater infiltration mitigation works within gravity sewer system. Preparation of EIS, design, installation and hydrostatic testing of pipelines.
Contract: 18 months
Value: $20 million

The Yamba Sewerage Augmentation Reticulation and Transfer Systems project is a significant sewerage upgrade for the township of Yamba, NSW, continuing Ledonne’s long standing working relationship with the Clarence Valley Council. The contract was awarded in January 2015.

Job Status: Complete (June 2016)

work 10-11-15 647 work 10-11-15 628 work 10-11-15 701 work 10-11-15 1015 work 10-11-15 1089 work 10-11-15 1305 IMG_5136[1] IMG_5153[1] IMG_5199[1] IMG_5137[1] IMG_5258[1] IMG_5185[1] work 10-11-15 1389 IMG_5127[1] work 10-11-15 1384 Yamba

IMG_5290[1]IMG_3770 IMG_5049 IMG_4900 IMG_4705 IMG_4663 IMG_4645 IMG_5258[1] diffuser 102